CRUSHER PRODUCTIVITY ANALYSIS IN COAL PROCESSING TO ACHIEVE MONTHLY PRODUCTION TARGET AT PT JAKSA LAKSA UTAMA SITE PT BGG LAHAT SOUTH SUMATRA
Keywords:
Coal, Crusher, Productivity, Effective Working Time, DelayAbstract
Crushing activities are an important stage in coal processing to meet production targets. This study aims to analyze the productivity performance of the crusher at PT Jaksa Laksa Utama Site PT Budi Gema Gempita during March 2025. The method used includes field observation, recording of daily production data, as well as analysis of effective working time and delay time. The results of the study show a work efficiency of 84.29% with an average effective working time of 15.17 hours/day and an average productivity of 720.9 tons/hour. Factors affecting productivity include delays due to mechanical disturbances, standby due to delays in material supply, and environmental conditions such as high rainfall. Improvement recommendations include optimizing working time, routine maintenance, and increasing coordination between operational units. The implementation of these efforts is expected to support the achievement of coal production targets optimally.
References
Barreto, D. T. D. S., & Khinanta, P. (2025). Peran Gas Alam Sebagai Bahan Bakar Penghubung Dalam Transisi Energi. Citizen: Jurnal Ilmiah Multidisiplin Indonesia, 5(4), 959-964. https://doi.org/10.53866/jimi.v5i4.856
Dewanto, O., & Abriansyah, A. (2020). Karakterisasi Lapisan Batubara PadaTambang Arantiga Dan Seluang Bengkulu Menggunakan Analisis Data Proksimat. Jurnal Geofisika Eksplorasi.
Dyni, A. N. R., Sarita, A. R., Alang, T. S. B. R., Bagaskara, M. A. A., & Prasetya, K. H. (2025). Cerdas Energi: Literasi Migas Terhadap Siswa Siswi MA Nuruddin Samboja Untuk Generasi Muda Berwawasan Energi. Solusi dan Inovasi Pengabdian Kepada Masyarakat, 1(1), 9-16. https://jurnalsolutiva-bpn.org/solutiva/article/view/12
Harisman, D. (2025). Kajian Produktivitas Stone Crusher Batuan Andesit Di Pt. Eka Praya Jaya Kabupaten Lombok Timur Provinsi Nusa Tenggara Barat. GEOMINING: Jurnal Teknik Pertambangan, 1(01), 17-25. https://ejournal.kabarmoe.com/index.php/geomining/article/view/10
Hartanto, B. G., & Rumbyarso, Y. P. A. (2025). Kajian Produktivitas Alat Berat di Proyek Jalan Bebas Hambatan Serang-Panimbang KM 27+ 100 Sampai dengan 30+ 100. Jurnal Ilmiah Universitas Batanghari Jambi, 25(1), 794-799. http://dx.doi.org/10.33087/jiubj.v25i1.5660
Kurniawan, F., Umam, M. I. H., & Kusumanto, I. (2025). Optimalisasi Penerapan Total Productive Maintenance Pada Mesin Mosher I Dengan Metode Overall Equipment Effectiveness. Jurnal Teknologi dan Manajemen Industri Terapan, 4(I), 1-9. https://doi.org/10.55826/jtmit.v4iI.526
Mahmud, D., Cahyono, Y. D. G., & Fanani, Y. (2024, March). Evaluasi Kinerja Crusher Dan Alat Support Untuk Meningkatkan Produksi di Crushing Plant PT. Nusa Halmahera Minerals. In Prosiding SENASTITAN: Seminar Nasional Teknologi Industri Berkelanjutan.
Marpaung, A. L., & Tibri, T. (2022). Variasi Waktu Daur Kerja Kerja Alat Angkut Dan Alat Gali Muat Untuk Pengangkutan Ore Di Pt Bumi Khatulistiwa Bauksit Kalimantan Barat.
Mulyadi, A., Nugroho, W., Trides, T., Respati, L. L., & Winarno, A. (2023). Evaluasi Kinerja Unit Coal Crushing Plant Dalam Pencapaian Produksi Di PT. Anugerah Bara Kaltim Kabupaten Kutai Kartanegara. Journal Transformation of Mandalika.
Nasrullah, N., Virgiyanti, L., Noveriady, N., Novalisae, N., & Putrawiyanta, I. P. (2025). Analisis Overall Equipment Effectiveness Pada Stone Crusher CV Kalimantan Makmur. Innovative: Journal Of Social Science Research, 5(4), 9206-9216. https://doi.org/10.31004/innovative.v5i4.19832
Ngaderman, T., Reliubun, L., Kudiai, S., & Rahmat, A. (2025). Batubara Bituminous Menjadi Asam Humat Sebagai Inovasi Pendamping Pupuk, Besum Papua. Jurnal Penelitian Ilmu Pendidikan Indonesia, 4(3), 1927-1937. https://doi.org/10.31004/jpion.v4i3.668
Salsabila, A. (2025). Upaya Hukum Terhadap Pencegahan Atas Pencemaran Udara Akibat Aktivitas Pembangkit Listrik Tenaga Uap Di Indonesia. Beleid, 3(1), 61-74. http://dx.doi.org/10.51825/beleid.v3i1.29545
Setiawan, A., Andani, C., Rahayu, D., Prawanti, D. A., Destiana, F., Humairoh, H., ... & Alfin, E. (2025). Saringan Sampah TB Simatupang sebagai benteng Ekologis Ciliwung: Kajian Etika Lingkungan dan Pembangunan Berkelanjutan. Jurnal Ilmiah Penelitian Mahasiswa, 3(4), 803-811. https://doi.org/10.61722/jipm.v3i4.1192
Tabang, K. K. D., & Province, E. K. (2020). Evaluasi Produktivitas Crusher Pada Coal Processing Plant Di PT. Bara Tabang, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur. Jurnal Teknologi Mineral Ft Unmul.
Virgiyanti, L., & Murati, F. (2024). Perhitungan Produksi Primary Crushing terhadap Ketercapaian Produksi di PT Mega Multi Energi. Journal of Social & Technology/Jurnal Sosial dan Teknologi (SOSTECH)